news 31 August 2026 Daily Monitor (Uganda)

MV Rafiki Suspension Creates Transport Woes for Kyamuswa Residents

The only public ferry serving the Entebbe-Kyamuswa route, MV Rafiki, has been taken out of service for up to four weeks due to damage sustained from floating debris on Lake Victoria. This interruption has left residents and traders facing increased costs and limited alternatives for travel. Source: https://www.monitor.co.ug/uganda/news/national/mv-rafiki-suspended-for-three-weeks-after-lake-victoria-debris-incident-5577736

MV Rafiki, also known as MV NODL Express, a critical public transport vessel on Lake Victoria’s Entebbe-Kyamuswa route in Kalangala District, has suspended operations for an estimated three to four weeks. The halt in service began on August 31, 2026, following a mechanical issue that occurred on August 27.

Nation Oil Distributors Limited (NODL), the vessel’s operator, stated that MV Rafiki encountered floating debris, including discarded fishing nets and plastic waste, while navigating the lake. The entanglement caused a mechanical fault, necessitating repairs. The company confirmed that the assessment revealed the need for servicing and repairs expected to take between three to four weeks.

This incident has significant implications for the residents of Kyamuswa County, who heavily rely on MV Rafiki for access to the mainland. The vessel plays a vital role in transporting passengers, traders, and essential goods. Its absence is particularly challenging as it was introduced as a temporary measure to improve water transport and reduce reliance on smaller, potentially less safe boats, following a nearly 30-year wait for consistent public water transport.

During the suspension, alternative travel options are limited and more expensive. Passengers can opt for the privately operated MV Armistone, which charges between Shs30,000 and Shs35,000 per trip, considerably higher than MV Rafiki’s subsidized fares. Wooden boats are also available but raise safety concerns, especially in adverse weather.

The interruption highlights ongoing concerns about the reliability of water transport in Kalangala, a district dependent on water vessels for accessing markets, healthcare, and education. The government had previously pledged to introduce more water vessels to the district, a promise that remains crucial for ensuring consistent and affordable transport for its residents and the reliable movement of goods.